Our portfolio of signature projects facilitates our clients to achieve their aspirations. We bring together a steadfast commitment to work ethics, innovative engineering, and relentless hard work to deliver critical energy infrastructure on time and on budget.
Integrated NASHPA Oilfield Project
Client: Oil & Gas Development Company Limited (OGDCL)
Acquiring the services of EPCC (Engineering, Procurement, Construction & Commissioning) Contractor for Gas Processing, LPG Recovery Plant & Allied Facilities at Nashpa Oil Field. The objective of the project was to construct a gas processing facility at NASHPA to process raw gas of NASHPA and separator gas from MELA Field. The plant produces LPG, Sales Gas, and Stabilized Condensate, helping minimize the energy crises in Pakistan.
Anticipated Production Capacity:
- 90 MMSCFD Sales Gas & Fuel Gas
- 16,800 Bbl/day Condensate
- 1,120 Bbl/day NGL
- 373 Mton/day LPG
- 1 Mton/day Propane
- +150 Bbl/day from Mela in Winter
Front End Compression Project at UCH Field
Client: OGDCL (with MHAA Foreign Alliance)
Located in Dera Bugti, Balochistan, the UCH gas field operates with an installed capacity of 600 MMSCFD. MHAA and its foreign alliance signed this EPCC project to install a Front End Compression System to cater to the depleting reservoir pressure over time. The setup features three Gas Turbine driven centrifugal compressor trains (02 operating and 01 standby) configured in parallel to maintain constant discharge operating pressure.
Technical Specifications:
- Compressors: 3 Gas Turbine driven centrifugal Compressor trains
- Configuration: 2 Operating, 1 Standby in parallel configuration
- Operating Pressure: Inlet ranges from 650 to 350 psig; Constant discharge at 870 psig
Compression System at Dakhni Oilfield
Client: OGDCL (with MHAA Alliances)
Engineering, Procurement, Construction, and Project Management (EPCC) agreement to install Compressor facilities (3 x 50%) to optimize production of depleting wells in Dakhni, Jand, and Soghri fields. The processing facilities at Dakhni include a separation system, gas sweetening, dehydration, and sulfur recovery unit to boost well pressure and lifetime output.
Integrated Process Systems:
- Separation System
- Amine Based Gas Sweetening
- TEG Gas Dehydration
- Dew Point Control & LPG Recovery
- Sulphur Recovery Unit
- 3 Reciprocating Compressors (3x50%)
Comprehensive Project List
Explore our full history of successfully executed contracts categorized by industry sectors.
EPCC Projects
| Project Name / Description | Reference Code |
|---|---|
| EPCC of Compression System at Dakhni Oilfield | PROC-FC/CB/PROJ-5139/2021 |
| Acquiring Services of EPCC Contractor for Gas Processing, LPG Recovery Plant & Allied Facilities at Nashpa Oil Field | PROC-FC/CB/PROJ/1247/768156/2015 |
| EPCC of Compression System at Uch Field | PROC-FC/CB/PROJ/UCH-COMP-5155/2023 |
Drilling Services Projects
| Project Description | Reference Code |
|---|---|
| Hiring of One Drilling Rigs Services | PROC-FD/CB/DO(RIGS)-1263/768023/2015 |
| Hiring of Air Drilling Services (2000 HP) | PROC-SERVICES/CB/DO-5262/2022 |
| Hiring of Services for Rehabilitation / Restoration of Hazardous/Semi-Hazardous Wastewater Pits of Nashpa Oil Field | PROC-SERVICES/LCB/HSEQ-4627/769746/2020 |
| Hiring of Waste Management Services for Water Base Mud | PROC-SERVICES/CB/DO-3066-A/769219/2019 |
| Hiring of Well Site Restoration / Rehabilitation Services | PROC-SERVICES/CB/WS-5232/2021 |
| Hiring of Services for Treatment / Safe Disposal of Waste Water | PROC-SERVICES/LCB/HSEQ-4626/769719/2020 |
Equipment & Material Supplies Projects
| Supply Description / Equipment Name | Reference / Alliances Code |
|---|---|
| Design, Manufacturing, Complete Testing and Supply of Pig Launcher & Receiver | PROC-FC/CB/PROJ-558/2012 |
| Supply of Potassium Chloride | OGDCL-SCM-LBB-DS-DOC230596046-2023/4400000625/2024 |
| Supply of Electrical Cables | PROC-FC/CB/PROJ/UCH-619/2013 |
| Supply of Electrical Cables | PROC-FC/CB/PROJ/UCH-610/2013 |
| Design, Manufacturing and Supply of Fuel Gas Electric Heater | PROC-FC/CB/PROJ-559/2012 |
| Supply of Instrument Cable, Cable Glands & Junction Boxes | PROC-FC/CB/PROJ/588/2012 |
| Supply of AAAC Greeley Conductor 1110KM | WPP-05-2014 |
| Supply & Procurement of 500KVA Double Circuit Transmission Line | NOR-NPP-03M-2018 |
| Supply of AAAC Greeley Conductor, 2134 KM | WPP-07-2014 |
| Supply of AAAC Greeley Conductor 1800KM | CPP-04M-2016 |
| Supply of AAAC Greeley Conductor 746 KM | TLM-08M-2019 |
| Supply of ACSR “Drake” Conductor and EHS Galvanized Steel Shield Wire for 500KV Neelum-Jhelum to Domeli Transmission Line | 3217(R1)-3M |
| Supply of Three Phase Separators | C14B007-HBP |
LPG Storage & Distribution Projects
| Project Scope | Status / Capacity Details |
|---|---|
| Import & Distribution of Liquefied Petroleum Gas | Active Distribution Outlets in North Region |
| Storage & Distribution of LPG from SAGA LPG Bottling Plant | 1100 Mton Storage & Bottling Plant Capacity |
| Installation & Enhancement of Storage Capacity of SAGA LPG | Upgrading Capacity up to 2200 Mton |